This is a view (before construction) looking east at the old transmission/ distribution pole 52/33 on the south side of the intersection of Roosevelt Road and Winnebago Street. One of the Phase-Over-Phase (POP) 69 kV Gang Operated Air Break (GOAB) switches was installed on this pole, and the 69 kV transmission to the west was transferred off existing pole 52/34 (on the other side of the street) to this pole. |
||||||||||||||
(61 KB) |
This is a view (before construction) looking north at the old transmission/ distribution pole 52/34 on the north side of the intersection of Roosevelt Road and Winnebago Street. The 69 kV transmission to the west was transferred off this pole onto existing pole 52/33 (on the other side of the street). |
||||||||||||||
(197 KB) |
This
is a view (before construction) looking east along Lincoln Road, at the location
of the drive into the Lincoln Road Substation. Existing distribution pole
DS6 (foreground) was replaced by new pole DS5. The existing distribution
to the east was transferred to this new pole, and the existing distribution
to the west was transferred and extended to this new pole. A new 3-phase
distribution circuit to the south was installed, and was connected to one
of the new switchgear breakers. |
||||||||||||||
(159 KB) |
This is
a view (before construction) looking southwest at the new Lincoln Road Substation site, at the
existing two-pole transmission corner structure consisting of pole 46/5 (background)
and 46/6 (foreground). The existing transmission to the northwest remained,
and a new pole TR1 was installed in the line east of this structure.
Pole TR1 had a 69 kV POP GOAB switches installed on it with
a new single-span transmission tap into the substation from the center switch
point. In addition, a new distribution riser was installed on the northwest
side of pole 46/6. This riser was connected to a second new switchgear
breaker, for extension of the overhead distribution (by the Owner). |
||||||||||||||
![]() (104 KB) |
This is the same view as the previous picture, but after completion of substation construction. |
||||||||||||||
Index |
|||||||||||||||
Project Drawings: |
|||||||||||||||
| Title Sheet (114 KB) One-Line Diagram (57 KB) Electric Plan (50 KB) |
With Autodesk's Express Viewer or Volo View, you can view (and print) several of the project drawings: |
||||||||||||||
| Framing Sheet (8 KB) |
Other project documents that are available. |
||||||||||||||
| Index |
|||||||||||||||
|
Autodesk® Viewer is required to view drawings |
|||||||||||||||
|
|||||||||||||||
|
|||||||||||||||
|
|||||||||||||||